A renovation of an existing regional airport, Coastal Carolina (EWN) Phase 1 created a new holdroom with jetbridges, a new security checkpoint, a complete interior renovation, and a remodeled bag claim area. Phase 2 included a remodeled ticket lobby, ATO offices, and an outbound bag screening area. The lighting design balances indirect lighting with focal downlighting and an invisible installation comes to life on the half hour dramatizing the sunrise, sunset or holiday feature displays. Occupants raved to us during programming how much they loved the result.
Area: 10,000sq ft
Value: $32M
Date: 2025
Lighting Design Firm: Hartranft Lighting Studios